经过数周的生产,公司承接的两台 260000/220kV 超高压变压器 生产正在稳步推进,各项工艺严格按照计划执行,生产进度取得重要进展。

  • 第 1 台变压器 已完成 吊罩检查,所有内部组件检验合格后,顺利完成 盖罩工序,进入后续工艺阶段。

  • 第 2 台变压器 已完成 器身整形,整体结构调整达到设计标准,并 回炉处理,以确保绝缘系统的稳定性。按照生产计划,该变压器将于 明日进入总装并进行注油作业

我们将继续秉持 质量第一、精益求精 的理念,严格把控每一道工艺环节,确保变压器产品的安全性和可靠性,按时高质量交付客户。

吊罩检查-1_压缩.jpg

Today, the production of the two 260000/220kV ultra-high voltage transformers undertaken by our company has progressed steadily, with all processes executed according to plan and significant milestones achieved.

  • The first transformer has successfully completed the lifting cover inspection. After all internal components passed rigorous quality checks, the cover was reinstalled, marking the transition to the next production stage.

  • The second transformer has completed core structure shaping, with all mechanical adjustments meeting design standards. It has now been returned to the oven for further processing, ensuring the stability of its insulation system. According to the production schedule, final assembly and oil filling will take place tomorrow.

We remain committed to our philosophy of quality first and continuous improvement, strictly controlling every production step to ensure the safety and reliability of our transformers, and delivering high-quality products on schedule.